Products
Navigation
Send Us A Message
Product Details:
PP PE Board Making Machine
PP PE sheet sizes:
Width:1200-3600mm
Thickness:1-40mm
Length:customzied
PP PE Sheet application:
PP PE sheet is widely as envinromentally friendly product which is widely applied in chemical industry,food industry,anti-corrosion industry,home appliance,electronics and packaging as well as other related industries.
Factory Condition
Machine Pictures:
Loader

Extruder

Size Table

Bracket Table

1. What is the energy consumption during equipment operation?
Our equipment uses energy-saving motors and heating systems, resulting in energy consumption 8%-12% lower than conventional equipment in the industry (for example, a PVC foam board line consumes approximately 50-80 kWh per hour, depending on production capacity). If your existing equipment consumes high energy, you can contact us for upgrade solutions (such as replacing energy-saving motors and optimizing temperature control systems) to help reduce long-term operating costs.
2. Can the equipment be adapted to different raw materials?
For example, what adjustments are required when switching from PVC to PP?
Some equipment supports multiple raw materials (this must be specified in the customization proposal). When switching from PVC to PP, screw speed, heating temperature, and mold parameters must be adjusted. Our engineers will provide detailed adjustment guides. If core components need to be replaced (such as screws adapted for different raw materials), we can provide genuine spare parts and replacement services to ensure normal operation of the equipment after the switch.
3. How long does it take from ordering to delivery of the equipment?
The delivery time for standard equipment (such as small plastic pipe production lines) is approximately 30-45 days. Customized production lines (such as large PVC building formwork production lines) are approximately 45-60 days, depending on the complexity of the solution. Regarding overseas logistics, sea freight to near-sea markets (such as Southeast Asia) takes approximately 7-15 days, while sea freight to ocean markets (such as the Americas and Africa) takes approximately 25-40 days. We will track the logistics progress throughout the entire process to ensure timely delivery.
Please Contact Us
Recommendation
We welcome your cooperation and we will develop with you.